On August 16, 2007, Silverado announced that it has contracted with Pickering of Jackson, Mississippi, to provide complete architectural and engineering plans for construction of Silverado's lignite water fuel (LWF) demonstration facility. The facility will be located on a fourteen-acre site already designated in the Red Hills Ecoplex outside Ackerman, Mississippi.

Pickering will provide detailed architectural and engineering construction plans for the building, including electrical, mechanical and structural designs for the LWF production and boiler test facility. In addition to the demonstration plant, plans will be conceived and delivered for the laboratory center and offices, storage tanks and the coal loading facility. Pickering, under previous agreement, provided Silverado the conceptual design for the lignite water fuel facility and laboratory.